I use it to monitor the battery voltages and current for the 48 volt propulsion bank. I cut the panel using a hand nibbler and dremel tool and some of the meters turned out to be have a little looser fit than I planned. One meter was starting to work its self out so it was time to secure it.
After removing the six screws that held the waterproof cover of the panel I had easy access to the meters. I also noticed a few scratches from the first install on the painted panel front
After removing the six screws that held the waterproof cover of the panel I had easy access to the meters. I also noticed a few scratches from the first install on the painted panel front
I used a little Marine GOOP to re secure it back into the panel. Since I had the cover open I retouched some of the scratches on the front panel using a black Sharpie Permanent Marker:
The Sharpie touch up worked well and I soon had the cover on the instrumentation panel ready to mount it back at it's helm position and could move on to the next project.