Showing posts with label SPRING OUTFITTING. Show all posts
Showing posts with label SPRING OUTFITTING. Show all posts

Monday, May 28, 2018

TYING THINGS UP!

 I got back on the boat the other day to get things ready for launching. I'm in no hurry this year as the spring has been rather wet and cold. Just messing about on the boat is nice since I have a harbor view from the boats location in the boat yard. So when NOAA said the day would be sunny and hot it seemed like a good idea to get down to BIANKA and start doing what needs to be done. When I got down to the boat it was indeed a hot day. Too hot to work in cabin much less down below the cockpit.
What to do except open a cold can of seltzer in the cockpit where there was a hint of a breeze and a little cooler. So some work around the cockpit seemed like the thing to do.
Looking around I noticed some of the wires around BIANKA's helm station looked like they could be tidied up.

They were out of the way enough but. making them a little neater and secure would not hurt. So I took out the newly bought Cable Tie Gun and went to work.

Once those were taken care of I remembered I needed to re secure the Helm Station platforms themselves as the old ty wraps holding them level had broken.  


Using the Tie Wrap Gun I had them re secured, tightened  and level in a few minutes. 


I think I should add a second ty wrap to add some extra holding power in the future. But, for now one should do. Then looking above my head I noticed that the wires for BIANKA's 48 volt solar panels needed to be secured. A few tie wraps slipped between aluminum bars and the job was done


It was a quick and easy job. But, one that helped make things neater and secure. Plus it made me feel somewhat productive on such a hot day.                  

Thursday, April 12, 2018

FIRST SPRING PROJECT DONE: TBS Expert Pro Battery Monitor instal

With winter finally releasing is grip on the Isle of Long it felt good to finally start to make a dent in the spring outfitting ToDo list. I choose a fast and easy one. Last year I bought a new controller from Annapolis Hybrid Marine. Unfortunately, the new controller was not compatible with the old Xantrex XBM Battery Monitor installed ten years ago. So I bought a new TBS E-xpert Pro Battery Monitor that is compatble with the new controller. It was a quick replacement as both fit the same mounting hole and I just had to plug it into the new controller box. The old XBM Battery Monitor will still be used on board since my plan is to re purpose it's use as a battery monitor for my current house bank. But, that is a project for another day.

Tuesday, April 04, 2017

SPRING CHECK SURPRISES: The Good and the Bad

A nice 60 degree F day in between rain storms. It has be awhile since I've checked on BIANKA about a month. Since that time we've had a near blizzard and some pretty heavy rains. I don't shrink wrap BIANKA for the winter having found the boat when shrink wrapped develops mildew in spots and generally tends to get grimy and feel humid when shrink wrapped. So I was surprised to see despite the snows and rains of the last month BIANKA's bilge was pretty dry except for the splash of antifreeze I left in it during my last visit:


She's a pretty tight boat. I think I helped make her tighter by taping over the cockpit hatches. This prevents excess water, ice and snow from leaking down below. Probably something I should do every year when storing her for the winter.

I just did a quick check and took some photos of a few things that are on the maintenance list. One of the items is the jammed Maceration pump. I'm not looking forward to working on this item for a number of reasons but, mostly because it's location looks like it is going to be a pain to get access to and remove. While taking some photos of the pump area I noticed that one of the clamps that secures the head intake and wash down hoses was severely rusted:


This is a boat sinking issue and it is moved to the top of the list of Spring Outfitting issues to address.

Monday, May 30, 2016

AN INSIDE JOB


I've been taking a little time this spring to refinish some of the cabin interior before launching. The left side in the photo has been done the right still needs to be. I'm using  Cetol Natural Teak. Easier to do this kind of stuff with the boat on the hard.

Friday, April 29, 2016

SPRING TAKING OFF

Got back to BIANKA for a quick check after doing some traveling. The sailing season is getting closer from the signs in the harbor. The moorings including BIANKA's have been dropped onto the harbor bottom:


Power boats are also starting to fill up the docks:


All signs it's time to start to get a move on getting BIANKA ready for the upcoming season. I'm starting off with removing some of the items that are no longer needed to have on board. These include the snow shovel I used to clear the deck of snow and ice over the winter and also the spare anti freeze that can be put away until next fall. I'm also taking off the rigging lines that will be washed at home before being rigged  :


Small steps but, at least it's a start.

Thursday, March 31, 2016

SPRINGING FORWARD AND GETTING OUT OF THE DOLDRUMS

I've been in sort of a boat doldrums for a few weeks now. I've not had much urgency to get down to the boat since my Electric Propulsion system does not require a whole lot of maintenance. I've instead been spending some time spring cleaning around the house and trying to figure out what to with some of the left over stuff I pulled off the boat when converting to Electric Propulsion. Thinking about EBAY, donating or selling out right. I've been cleaning out a lot of stuff in the Den where I'll be hopefully working on a new sail cover and cushions for the Engel refrigerators in the main cabin. Now that Spring has officially arrived I feel the boat calling again. So I ordered a few items I know I'll be needing for the upcoming season.

I pretty much am a single hand sailor these days. One thing I bought since it really makes a lot of sense for me to use is a Pick Up Buoy.   I don't know why it has taken me so long to buy one. I was getting along quite well with an empty milk container tied to the mooring pennant lines and a boat hook since 1996. But, after watching a neighboring sailboat use his it just makes a lot of sense for me. Especially since the winds and the currents in the harbor do not always cooperate sometimes requiring me to sometimes make another pass to snag the line.

Another item I knew I'll be needing in the up coming weeks is some Cetol Marine Natural Teak Wood Finish. I've been using Cetol for years mostly on the cockpit hatches, bright.work and handrails. Last spring I decided to use it to spruce up the galley area, companionway steps and the headliner project . I was pleased with the look and ease of application. So I'm planning on using it on other areas of the cabin this year. I bought two quarts since I also plan to use it on some unpainted molding at the house.


I've got a few more things I'll need to order  for the up coming season but, they can wait until I get closer to a launch date. For now these along with 9 yards of Sunbrella fabric for the new Sail Cover will keep me busy enough.

Saturday, March 12, 2016

A TASTE OF SPRING

With the temperature rising into the 70's earlier this week there was no excuse not to head down to the boatyard and check on BIANKA. It had been a couple of weeks since the last visit and despite some nasty weather and a couple of days of high winds I saw no further damage on the deck area. Even the bilge looked surprisingly similar to when I left it. No additional water had entered except the little bit of antifreeze I splashed into it back in February:

Good to see. Apparently the previous water levels I had observed were from snow that had gotten blown in through some of the hatches during the winter storms. All was well so I got to work on starting to implement some spring projects. one was to make some custom seat cushions for the two Engel refrigeration units I have on board in the main cabin. Unpacking some of the patterning material I had bought from Sailrite I quickly made an outline of the Engel tops on the pattern material:


After cutting out the pattern. I'll be taking it home to use my Sailrite sewing machine in fabricating the new cushions. I'm not the only one who will be fabricating some new things this year. The boatyard guys are busy fabricating some new floating docks to replace ones that were damaged when the harbor suffered a quick freeze during a cold snap a few weeks ago:


Spring is just around the corner and I'll be getting busier getting BIANKA ready for the up coming season.

Tuesday, June 30, 2015

MESSING ABOUT IN BOATS: Honda 2000i Oil Change Help


One of the maintenance rituals I do before launching is to change the oil in the Honda 2000 EU generator. I've been able to significantly reduce the the mess of this procedure by using a Hopkins Measure Funnel:

While this eliminates a lot of the mess of the oil changing procedure I still...

Saturday, May 30, 2015

A BELUGA WHALE EPIPHANY



Coming back from the Exumas cruise I had good intentions to get BIANKA splashed as soon as possible. Until I heard of some unusual visitors in Long Island Sound. Three Beluga Whales where feeding and playing around in various harbors on Long Island Sound. Since these creatures normally reside in Arctic waters having them in the local area is a reminder that the cold temperatures of the past brutal winter are still leaving their mark on the local waters. So that I might not be able to start swimming off the boat soon.  I'm now thinking there really is no rush to get  launch the boat and get out to the mooring until things warm up a bit. I'll continue on my various brightwork projects for another week or so. Trimming with paint brushes is always better when the boat is not moving about anyway.

Tuesday, May 05, 2015

BOTTOMS UP!

It's getting busier in the boatyard and roomier too as the boats begin to get launched. The smell of bottom paint starts filling the air. My boatyard's contract has a stipulation that only they can paint the bottom which as I get older seems like a better idea anyway. Though when thinking about bottom painting I get reminded of something I saw in Oyster Bay last fall. It was the test station for one of the manufacturers of marine bottom paints:

Monday, April 27, 2015

TOUCHING UP THE HANDRAILS PLAN A & PLAN B

Having spent some time removing, re-bedding and refinishing BIANKA's handrails back in 2011. It was time to do a little touch up. Like most painting and varnishing projects prepping the area takes longer than the actual brush work. So in keeping with my desire to use what you have and recycling things wherever possible I cam up with what I thought would be a cunning plan to prep the area around the handrails. I'd use a patterned piece to used shrink wrap to fit under the handrails to catch any drips. I could also reuse the patterned shrink wrap in the future too. So I cut a long strip of recycled shrink wrap and laid it over the handrail:

Friday, April 24, 2015

LITTLE THINGS

The brutal winter is finally behind us and I've been spending more and more days on the boat. The electric propulsion system requires so little maintenance that I can concentrate on other areas that need a little more attention. Things like touching up some of the bright work. Such as putting fresh coat of CETOL on the grab rails. As I poke around I keep finding little things that I forgot were on board. For example I went into the storage locker to get some paint brushes for the touch up work and I came upon this:

It's a can of some red spray paint. This was bought and last used years ago to

Monday, March 24, 2014

UPDATING THE ELECTRIC PADDLE

Well another 50 degree F plus day came along between cold snaps. So I wandered down to the boatyard to check on the boat. I stopped by the office for a gam and Russel was busy sending out bills to drop the moorings. A bittersweet sign that the new sailing season is coming. But, of course so does the bill for the mooring. When I got on board I checked the bilge:

Still dry as a bone and good to see. I let my Dual Pro 4 charger top off the four 8A4D AGM batteries that make up the 48 volt propulsion bank of BIANKA. Though they were pretty much full already. I then turned my attention to a quick little issue regarding the new Electric Paddle outboard I bought. A few weeks ago I got a letter in the mail from the folks who make the Electric Paddle about a possible issue of corrosion on one of the connector terminals because of a missing seal on the connector. A follow up letter provided two brand new seals to be installed in case they were not on my outboards connector:

It turns out they weren't on my outboard's connector but, no harm was done as the connectors were completely clean and corrosion free. Even though the battery and outboard had been exposed to several rainstorms over the season.

After I put one of the seals on the connector I decided to just do a little preventative maintenance as long as I was here. I took one of the Connector Cleaning Brushes  I carry onboard and put some Corrosion Block on it:


Even though the connectors were still very clean and showed no signs of corrosion. Using the Corrosion Block can't hurt so I cleaned inside the plugs and pins of the connectors:



Mission accomplished!  Nice to see that the folks who make the Electric Paddle here in the United States also follow up on the products once they are shipped.

Monday, March 10, 2014

DON'T JUST SIT THERE, DO SOMETHING



The winter has been terrible filled with snow and cold temperatures. So much so that I only got to visit the boat two times since December. While things were OK on the boat. It was still too cold to spend much time on board on projects and spring outfitting. It's too cold for any painting, varnishing, epoxy. Even holding metal tools for any length of time is not fun with temperatures in the mid 20's. Still I try to accomplish something in the short time I do spend on board. For example I noticed that the ENGEL MT25E refrigerator/freezer needs a little attention after ten years of reliable service:


Because of it's location near the hatch it has developed some rust on the compressor case:


My plan is to sand that off and touch it up with some paint. That is when things get warm enough to bring it outside to work on it. But, since it has been so reliable for the past decade I've never had to do any maintenance on the unit. So like the screws on my Honda 2000 generator some the screws on the ENGEL case may have  rusted in place:



So I figured the least I could do during my visit was to spray some   Corrosion Block penetrate onto the screws and letting it go to work:


I'm hoping it will make removing the screws in the future a much easier process once things warm up enough to spend more time on the boat. At least that's the plan. It's just a little thing to do but, gives me the feeling that at least something was accomplished during the winter visit.

Saturday, June 01, 2013

COOL WATER


"All day I face the barren waste without the taste of water,"
Cool Water


It been hot in the boatyard with the temperature just hovering around 90 degrees. Too hot in the middle of the day to work on installing the chain chain stopper on the forward deck. I was getting thirsty so my thoughts turned to water. Seemed like a good time to fill the smaller of the two water tanks on BIANKA so I could have some water on board for cleaning and washing up. While I was at it seems like a good time to clean the Brita 35530 Ultramax Dispenser and put a new   Brita replacement filter in it too.


I use this Brita for my drinking and cooking water on board BIANKA. It sits very nicely in a cubby in the galley area on board. Since it holds a little over a gallon one fill up can last me a few days. I have nice filtered water easily available which  is important during these hot days while working on the boat.

Saturday, May 25, 2013

TIME TO GET MOVING


Well, Memorial day weekend has rolled around and despite my best efforts to have the boat in the water before now, BIANKA is still high and dry. Some freelance work gigs and and a two week vacation that included a week cruising the Florida Keys have once again conspired to delay the splashing of my boat. But, now it is time to hit the ground running. I already have the shaft zinc ready to put on and my copy of the ELDRIDGE TIDE AND PILOT on board.
But, I've still got a few projects I'd like to get done before the boat is put into the water. I've bought a Chain Stopper  which will help me raise and secure the anchor chain. I kind of need to install this this while I have access to the anchor locker and before the mast gets stepped. So it will be somewhat of a priority I also need to permanently mount the now completed helm instrumentation panel. Likewise the AIS electronics also needs to find a permanent home. The Lexan part of the solar bimini torn off by hurricane Sandy need to be reinstalled. I also need to look at why the wash down pump was not working during winter layup.  Then there is the usual bright work touch ups. The list will grow but, one thing that does not need much attention is the electric propulsion system. It's been charged up over the winter ready to go. No fluids, zincs, hoses need to be checked. No impellers replaced and no mysterious leaks to be traced and cleaned up. With a little luck I hope to have BIANKA in the water by next weekend. At least that's the plan.

Friday, May 03, 2013

A LITTLE ORGANIZATION PLEASE

The winter was cold and wet so other than a few quick checks I did not spend much time on board. So the cabin pretty much stayed somewhat disorganized from the post Sandy cleanup:
As you can see there are some things that really have no place in the cabin. Like the fender thrown in as I was buttoning up before the boat was pulled it really does not belong in the cabin. Also the piece of Lexan that use to be secured to to the solar bimini but, was not secure enough to survive the 95 MPH winds of Hurricane Sandy should be out of here. So now that it's time to start getting the boat ready for spring outfitting a little organization might is in order:
 It may not look like much improvement but, dropping the table down and having better access to various tools and parts really helps me find things as I go around and do some spring boat maintenance. Once the boat is ready for launch then everything gets stowed away properly. But, for now having things very accessible is the plan

Friday, June 29, 2012

CHECKING THE MAST LIGHTS

I pull the mast on BIANKA every year. I do this because having the mast up while the boat is on land puts stresses on the boat that are not as large when it is in the water because the hull does not move as on a mooring. It also allows me to have easy access to the chain locker and the windlass motor. It also allows me to inspect the mast and checkout the wiring and lights since the mast is on ground level.  I've mentioned how much I like to use Anderson Powerpole Connectors on board for connections. It also allows me to make various  adapters that help in testing various items around the boat.




 Using a small 12 battery and adapters made using Anderson Powerpole Connectors  and matching connectors for the mast fittings makes checking the mast light wiring an easy task.