Showing posts with label repairing. Show all posts
Showing posts with label repairing. Show all posts

Wednesday, April 27, 2022

A SPRINGTIME SOLAR SURPRISE

 I've been away from the boat for awhile. I was traveling to warm places each month over the winter. Plus getting COVID knocked me down but, not out for two weeks. So I did not get on BIANKA for my usual checkups and battery charges. Usually that would not be a problem since my 48 volt solar panels would keep things topped up. So it was a surprise when I looked at the data from the new Victron SmartSolar MPPT 100-Volt 20 amp 48V solar controller.  

Where I noticed several days of no charging data and when there was some charging it was lower than usual. I also noticed the Dual Pro four bank charger was charging at the lowest bar display. This meant the batteries where in a more discharged condition than I've seen in a long time.  

Time for some serious diagnosis on what was happening with the solar charging system. I first checked the 48 volt solar panel voltages and they were near their open circuit voltage specs. I then turned my attention to the Anderson connectors that I used to combine the panel wires to the solar controller. It was there I found the problem. I installed the panels and connectors over twelve years ago. My mistake was never doing any maintenance on the connectors in those years. I found despite taping the connectors to improve their water proofing most of the Anderson contacts had corroded to the point where they were no longer conducting voltage.


I redid the connection using some Spade Connectors I had on board and the problem was solved if only temporarily. Now I need to see if the 48 volt electric propulsion battery bank comes back to full charge as we head toward spring launching. 

BLOG UPDATE:  Going back a few days later and the solar controller charging and battery bank was back to normal. 
 The battery bank was charging normally using the Dual Pro charger. So it looks like things are moving in the right direction for a spring launching.
 


Friday, September 05, 2014

ASSUMPTIONS PART TWO: Moorings


So since I got a late start on my cruising plans I headed out as soon as my schedule was clear.  When I got to Mattituck I was looking at a pin that held the swivel to the anchor chain. It was looking somewhat iffy. I had  new replacement shackles and swivel on board. So I thought when I got to my next destination which was Three Mile Harbor on Long Island I'd pick up a town mooring and replace the anchor swivel and shackles.  I arrived at the channel to the harbor at just about sunset and by the time I got into the harbor after dark. I could not find the town moorings so I picked up and vacant one. In the morning I gave the harbor master a call to ask where the town moorings were located. He replied that the town trustees had decided not to put them in this year. Once again my assumption that the moorings would still be available turned out to be my mistake. Luckily, I was able to get on another mooring thanks to a local boatyard who had a spare mooring available due to the owner being away. At least I was able to replace the anchor swivel at a leisurely pace. But, it was a reminder not to assume that things that were there before will still be there on your next visit.

Tuesday, September 03, 2013

PUMP IT UP: Repairing a FloJet 4300 Series Washdown Pump Part One

Pump it up until you can feel it.
Pump it up when you don't really need it.
 Elvis Costello

At the end of last season I discovered two of the four electric pumps on board BIANKA did not work. They both were feed from the same circuit breaker but, do not operate at the same time. One was the Wash Down pump used to clean the anchor chain after it's been laying on mucky bottoms. The other was the Macerator pump that is used usually once a year on haul out after I rinse out the holding tank. Neither one would power up. Sounded to me like a power issue since both pumps were fed from the same circuit. Having two pumps fail at the same time seemed against the odds. Sounded to to be an easy fix. Most likely a power issue.  First I measured the voltage from the circuit breaker panel it read the nominal 12 volts. Well, then gotta be the switch that switches between which of the pumps will be energized. But, when I checked the switch it was good. Oh well. Looks like both pumps did fail at the same time. Since one pump was for the wash down and used every time I hoist the anchor and the other pump was for the macerator and really only used one time each year when cleaning and winterizing the holding tank for storage. I decide the wash down pump was the priority.

The wash down pump is a Flojet 4300 series pump. A 4305-143 to be precise and had been on the boat since I bought her in 1995. It had worked well until now. The pump is located in behind a panel the head area along with the pressure water pump and the shower sump pump:


Pretty easy to get to unlike the macerator pump which is buried under some cabinetry and hoses. Though because all the wiring was connected with crimped splices I had to cut the wires to remove the pump from the cabinet. But, I decided to rewire the pump with Anderson Powerpole connectors to make future removal of the pump and trouble shooting easier.

After removing the pump I looked for anything obvious that might have caused the failure:

Not seeing anything suspicious I followed red 12 volt lead that went into a small module on the pump and exited out the other side and connected to the motor. The is the pressure switch that shuts off the pump when the pressure reaches a certain level. Taking the cover off of this module exposed it's connections:
Nothing unusual but, I did notice a little melting and discoloration of the wire and some melting on the housing of the switch:


Well this certainly was worth investigating. The connections to the wires looked good but, when I took out my meter and measured across them I found a high resistance across the leads:

I measured 4 meg ohms not a totally open circuit but, high enough to prevent the pump  from operating. I decided to first remove the spade connectors clean the contacts to see if that improved the readings:


Having done that I still measured a high resistance. So I decided to remove the pressure switch module from the body of the pump:


I had no parts diagram of this part of the pump so I could not be sure how things were supposed to look. But, when I went back and measured across the leads of the pressure switch I read about three ohms so that seemed to be normal. I put the pressure switch module back on to the pump and reinstalled the pump back into the locker. After connecting the wash down hose I applied power and the pump began gushing out water. Ah, fixed I thought. I shut down the power put a nozzle onto the hose and fired up the pump again. I could hear the pump as it pressurized the hose and then shutdown like it should. But after opening the nozzle and relieving the pressure the pump still  failed to turn on.  So it looks like I'll need to do a little more troubleshooting but, before I do I will get a replacement pressure switch. Since that looks like where the problem is. Though the documentation shows there is not such part. It looks like I may need to order a whole upper housing. I'll be making a call into FloJet customer service to see if this is the case before I continue.

FOR  PART TWO OF THE PUMP REPAIR CLICK HERE